Project Details
  • Specialized paint works for equipment, machinery, and mineral tanks for oil, diesel, and water in Al-Hammad factories, Batra, West Dekernes, and Batra 11.
  • Planting works and reinforcing the studs of the two towers of the LPG project in Tatra Mansoura.
  • Water sandblasting works and epoxy protection paints for the Fire Fighting Line, West Dekernes Project, LPG, and Batra.
  • Thermal insulation works for the equipment of the bridge factory and the extension.
  • Treatment, isolation, and implementation of grout work for equipment bases.
  • Sanding and epoxy painting work for metal tanks inside and out at Al-Hammad and Batra project in the Delta region.
  • Thermal insulation works using rock wool for boilers, pipes, and packaging using aluminum in the LPG Dekernes project.
  • Renting and executing metal scaffolding around oil tanks (the process of creating continuity tanks)
  • Dismantling a cable (temperature sensor) around 3 tanks at the Tora factory, including installing scaffolding around the tanks.
  • Design, implementation, and installation work of a stainless steel system to treat oil leakage from the mobile roof of the oil tank at the Tora site.
  • Insulation and lining work with epoxy reinforced with fiberglass for the Hot Oil room of the LPG project in Tora.
  • Cold welding works to prevent oil leakage from the welding area of the ceiling with the walls of the oil tanks in the extension project using carbon fiber.
  • Insulation works for all Cellars rooms, fire basins, and K.O.Drum rooms in all the company’s field sites in the Delta region.
Project Pictures
More projects